PIPELINE carried out excavation and preparatory works along a designated gas pipeline route.
The scope included trench excavation, material handling, backfilling and terrain preparation in accordance with project requirements.
PIPELINE’s role was strictly limited to excavation and related earthworks. Pipeline construction and installation were not part of the project scope.
Scope of work:
Excavation, trenching, backfilling and terrain preparation
Machinery used:
20–30 ton excavators, dump trucks, rollers
Project status:
Completed